17/01/2012 - Linc Energy in Talks with Cornerstone InvestorClick here for more details
UCG to GTL Demonstration Facility by night
UCG to GTL Demonstration Facility by day
UCG to GTL Demonstration Facility by day
UCG to GTL Demonstration Facility by night
Aerial of the GTL pilot plant
UCG synthesis gas feeds into the GTL pilot plant
UCG Gasifier 3 infrastructure at the facility
World-class 24 hour laboratory at the facility
A worker on manifolds for UCG Gasifier 3
UCG to GTL Demonstration Facility by night
Workers in front of the of GTL pilot plant
A worker on UCG Gasifier 4 infrastructure
A worker on UCG oxygen injection infrastructure
Groundwater monitoring at the facility
Drilling for UCG Gasifier 5
Drilling for UCG Gasifier 5
UCG Gasifier 5 pipeline to GTL pilot plant
UCG Gasifier 5 infrastructure
Construction of UCG Gasifier 5 infrastructure
Construction of UCG Gasifier 5 infrastructure
Wastewater treatment plant at the facility
